Key activities required to achieve the goals

After the construction of a hangar for the accommodation of aircraft as well as a platform for parking aircraft in 2021, in 2022 the construction of the runway with a solid pavement structure, turnstiles, taxiways, base tracks, RESA, drainage system was completed. with retention, perimeter road, perimeter fence and electric power cable.

Also in 2022, the production of design and technical documentation for the construction of the II phase of the airport construction was contracted, which includes the extension of the runway of a solid pavement structure for the official ATR72 aircraft, a new turnpike, taxiways, platform, base track, RESA, drainage system with retention, perimeter road , perimeter fence, hangar and supporting systems.